Part of event: Nord Stream pipeline turned on before 2027? · nord-stream-pipeline-turned-on-before-2027
Market structure and 24h change as reported by Polymarket's public API.
Top of book
Best bid
0.050
Best ask
0.098
Spread
65% of mid
4.80 pts
As reported by Polymarket's public API at 10:54 UTC; top of book, not full depth; per-side depth not shown. The spread is shown against the midpoint of the two quotes above, which is arithmetic on the venue's figures, not a figure the venue reports.
Volume
24h volume
$10,640
Total volume
$162,319
Volume as reported by Polymarket's public API.
Resolution rules
Rules as stated by Polymarket, reproduced verbatim. Convexly has not independently reviewed them and does not endorse them; the rating's resolution-reliability pillar treats rule text as present but not independently reviewed.
This market will resolve to "Yes" if any line of either Nord Stream 1 or Nord Stream 2 delivers natural gas to Germany or any EU member state in commercial quantities at any point by December 31, 2026, 11:59 PM ET. Otherwise, this market will resolve to "No". "Commercial quantities" refers to sustained, measurable flows of gas intended for end-user distribution. Test flows, pressure tests, or symbolic gas transfers not tied to actual supply operations will not count. The resolution source will be a consensus of credible reporting.Show the full rules textHide the full rules text
This market will resolve to "Yes" if any line of either Nord Stream 1 or Nord Stream 2 delivers natural gas to Germany or any EU member state in commercial quantities at any point by December 31, 2026, 11:59 PM ET. Otherwise, this market will resolve to "No". "Commercial quantities" refers to sustained, measurable flows of gas intended for end-user distribution. Test flows, pressure tests, or symbolic gas transfers not tied to actual supply operations will not count. The resolution source will be a consensus of credible reporting.
Resolution mechanics
Resolution parameters as stated by Polymarket.
- Resolved by (UMA adapter)
- 0x65070BE91477460D8A7AeEb94ef92fe056C2f2A7
- Proposer bond
- $500 proposer bond
- Proposer reward
- $5 proposer reward
Market Trust diagnostic · v0.2 candidate
Nord Stream pipeline turned on before 2027?
This market is not in the v0.1 daily card set yet. The v0.2 diagnostic scorecard below shows the per-pillar contribution from the latest materializer run, with visible caveats and evidence-status separation.
Why this rating
Why this rating
Composite 48 · Do not cite
Measurement certainty
Low
1 measured · 3 modeled · 2 not assessed
Certainty reflects how much of this market we measured, not how good the market is.
- CoherenceModeled estimatefixed rules, not a per-market measurementweight 25.0
No full-provenance CME signal is linked to this condition in the current ledger window; absence of a signal is not proof of coherence.
- · no linked cme signal in window
- · absence of signal not proof of coherence
- · cme signal window days: 7
- · recent full provenance signals: 21
50+17.9 - ExecutabilityModeled estimatefixed rules, not a per-market measurementweight 20.0
Executability scored as worse-of(spread, depth) from a single orderbook snapshot; the two were merged from the former liquidity + depth pillars to stop double-counting one correlated source.
- · executability worse of spread depth
- · spread: top-of-book spread 4.7c
- · spread: spread is 69% of mid, heavy slippage on size
- · spread: pp-band-to-cents-band approximation in effect (depth_5pct_usd/2 per side); per-side decomposition pending substrate work
15+4.3 - Resolution reliabilityModeled estimatefixed rules, not a per-market measurementweight 20.0
Resolution source and rule text are present but not independently reviewed.
- · resolution metadata present manual review pending
70+20.0 - Participant flowNot assessednot yet measured for this marketweight 20.0
No participant flow rollup materialized yet.
- · participant flow pending
not assessednot assessed - Integrity-risk screenNot assessednot yet measured for this marketweight 10.0
No participant concentration rollup materialized yet.
- · missing input
not assessednot assessed - Audit completenessMeasuredweight 5.0
3 linked artifacts; 1 missing hashes; 0 stale/failing sources.
- · artifact hash missing
- · source watermarks healthy
85+6.1
How it adds up: composite = Σ(score × weight) / Σ(weight) across measured + heuristic pillars only. Pending and data-rights-blocked pillars are excluded from both numerator and denominator. Total contributing weight = 70.0.
Caveat: 2 pillars not assessed yet; the score will recompute as the substrate fills in.
Structural coherence read
The Coherent Markets Engine checks this market's pricing for structural inconsistencies against related markets. Whether a current signal exists, and its construction, is included with Researcher.
See ResearcherMarket opened 2025-11-04 · minimum order size 5 shares · price tick size 0.001 · as stated by Polymarket.